One project data model
- Tags, cables, pipes, I/O and drawings remain connected
- ITRs, certificates, punchlists and workpacks live in the same project
- Data moves with the plant into operations
Completions Deliverables Management System
CompletionsDS (CDS) connects engineering asset data, inspection and test records, punchlists, workpacks, PCS, Vendor Management & Reporting — all in one live project change-managed environment.
Connected delivery
Experience delivering completions on projects for
Traditional handover means reconciling spreadsheets, static registers and disconnected drawings weeks before turnover — with silent gaps discovered too late.
The problem
Evidence lives in too many places, and none of it reconciles until the deadline is already in sight.
How CDS fixes it
CDS keeps every completions artefact — ITRs, punchlists, certificates and workpacks — in one live project environment, streamlined for tracking Factory, Construction, Commissioning and Final Handover deliverables.
Get it right before importing.
Overview
CDS connects asset data, inspection and test records, punchlists, workpacks, certification, reporting and handover evidence in one controlled project environment.
From factory execution to operations, with structured WBS and source-register imports.
02ITRs, E-Forms, punchlisting, weekly planning and controlled rework.
03PCC, P&ID, network and readiness reporting in the plant context.
04Certificates, vendors, roles, audit trails and compliance controls.
05Dossiers, closeout registers and continuity into operations.
06Faster setup, clearer priorities, portable closeout and expert support.
Lifecycle
Build the information structure early so evidence flows cleanly into handover — structured data, early decisions and AI-assisted setup mean cleaner handovers and faster time to operations.
Minimum source data
Execution
Turn completions evidence and deficiencies into controlled, executable workflows.
One matrix serves tags, cables and pipes. Word, fillable PDF and native E-Forms operate side by side.
Sectioned templates, conditional fields, record locking and configurable Executor / Reviewer / Approver workflows.
Real-time defect capture, photos, coordinates and Android / iOS support.
AI effort estimates, multi-trade allocation, constraint visibility and traceable RW-xxx rework packs.
Native mobile capture on Android and iOS.
Visibility
See completion status in registers, drawings, networks, schedules and executive views.
Group tags across systems into functional control circuits. Compare forecast and actual starts, and drill into stage status.
Recolour pipes and instruments by test-record status on the latest issued revision. Hover for ITR, punchlist and test-pack detail.
Graph tags, pipes, cables and PCCs. Filter by discipline, workpack or sub-system and jump directly to register rows.
Focus attention on incomplete deliverables, blockers and readiness at WBS, PCC and workpack levels.
Dashboards, gauges, Gantt views, Skyline timelines, activity logs and configurable Excel exports.
Classify equipment, propose WBS structures, estimate effort, identify matrix gaps and draft weekly executive summaries from the audit trail.
CDS connects status to the physical and functional context of the plant, reducing the need to reconcile disconnected spreadsheets, drawings and registers.
Governance
Maintain auditable control while building the final turnover package continuously.
Handover is generated from controlled project records — not recreated as an end-of-project export exercise.
Value
A practical platform designed around the realities of major-project completions.
Am-I-Ready reporting directs effort toward incomplete and constrained deliverables.
Automatic record allocation, imports, barcodes and digital workflows reduce manual handling.
Graphical dashboards, Gantt views and plant-context reporting show status clearly.
Nominal record hours and crew-aware planning provide an early view of labour demand.
Dossiers and register exports support project completion without mandatory ongoing storage.
Direct access to personnel with software-development and major-project completions experience.
CDS provides a continuous information pathway from project setup and field execution through certification, handover and operations.
Why Software First
CompletionsDS is developed by Software First. It wasn't designed in the abstract — it comes from people who have run completions on major resources and infrastructure projects, and who are still directly reachable when you're on the tools.
Early engagement and data validation save substantial database re-work later.
FAQ
Asset data, inspection and test records, punchlists, workpacks, certification, reporting and handover evidence — connected in one project environment. Tags, cables, pipes, I/O and drawings stay linked to the ITRs, certificates and workpacks that belong to them.
As a minimum: mechanical, electrical and instrument registers, cables, PLC I/O, sub-system dates, drawings, vendors and spares. Setup runs in four phases — project shell, prerequisites, register import, then form template selection.
Early engagement and data validation are completed before CDS setup, which saves substantial database re-work. Import mapping, error recovery and Template Projects — which clone a company-specific golden setup — all accelerate mobilisation. Get it right before importing.
Yes. Field punchlisting captures defects, photos and coordinates in real time with Android and iOS support, and updates land centrally straight away. Uploaded, rejected and completed records all keep a controlled history.
In specific, checkable places: an Equipment Classifier proposes disciplines and project stages, a WBS Planner develops a defensible hierarchy from imported data, effort estimates feed weekly planning, matrix gaps are identified, and weekly executive summaries are drafted from the audit trail.
ITRs, certificates and workpack documents bundled by workpack, with skip and failure reporting so silent gaps can't pass. Large dossiers support staged delivery, and portable Excel registers mean closeout doesn't depend on ongoing storage with us. Handover is generated from controlled project records, not recreated as an end-of-project export exercise.
Yes — through structured register exports built to be loaded into an asset register or CMMS rather than re-keyed. Tag, sub-system and workpack keys are carried through, so completion status, certificates and any outstanding punchlist items land against the right asset. Export layout is configurable and agreed during setup so it matches your target system's load format.
Yes. Executor / Reviewer / Approver workflows are configurable, certificates support CVC and NOE registers with multiple active certificates per tag, and configurable stage gates control when downstream work opens.
CompletionsDS is hosted and operated by Software First on Microsoft Azure in an Australian region, with per-project access, role-based permissions and full activity logging. Hosting, access control, backup, application security and what happens to your data at the end of the project are all covered on the security and hosting page — and a completed vendor questionnaire is available on request.
Contact
Tell us what you're delivering and where you are in the schedule. We'll show you how CDS would be set up for it — and be straight with you if it isn't the right fit.