Completions Deliverables Management System

One controlled environment for construction, commissioning & handover deliverables.

CompletionsDS (CDS) connects engineering asset data, inspection and test records, punchlists, workpacks, PCS, Vendor Management & Reporting — all in one live project change-managed environment.

  • Connected data
  • Controlled evidence
  • Clear readiness

Connected delivery

  • FactoryVendor & FAT records
  • ConstructionITRs & punchlists
  • CommissioningReadiness & control
  • HandoverDossiers & closeout
  • OperationsData moves with the plant

Experience delivering completions on projects for

  • Rio Tinto
  • Fortescue
  • Talison Lithium
  • Visionstream
  • WSG Energy Services
  • Rise Specialised Services

Handover shouldn't be a reconciliation exercise

Traditional handover means reconciling spreadsheets, static registers and disconnected drawings weeks before turnover — with silent gaps discovered too late.

The problem

Evidence lives in too many places, and none of it reconciles until the deadline is already in sight.

Poor project setup compounds the pain

  • Missing registers
  • Unmapped ITR matrices
  • Unclear WBS structures
  • Resulting rework and delays through to handover

How CDS fixes it

CDS keeps every completions artefact — ITRs, punchlists, certificates and workpacks — in one live project environment, streamlined for tracking Factory, Construction, Commissioning and Final Handover deliverables.

Early engagement and data validation

  • Completed before CDS setup
  • Saves substantial database re-work

Get it right before importing.

Overview

A single source of truth for completions

CDS connects asset data, inspection and test records, punchlists, workpacks, certification, reporting and handover evidence in one controlled project environment.

At a glance

  • Live readiness and constraint visibility
  • Field-to-office digital workflows
  • Auditable governance and sign-off
  • Structured handover from controlled records

Lifecycle

Lifecycle and project foundations

Build the information structure early so evidence flows cleanly into handover — structured data, early decisions and AI-assisted setup mean cleaner handovers and faster time to operations.

One project data model

  • Tags, cables, pipes, I/O and drawings remain connected
  • ITRs, certificates, punchlists and workpacks live in the same project
  • Data moves with the plant into operations

Four-phase setup

  • Project shell
  • Prerequisites
  • Register import
  • Form template selection

AI-assisted foundation

  • Equipment Classifier proposes disciplines and project stages
  • WBS Planner develops a defensible hierarchy from imported data
  • Template Projects clone a company-specific golden setup
  • Import mapping and error recovery accelerate mobilisation

Minimum source data

  • Mechanical
  • Electrical
  • Instruments
  • Cables
  • PLC I/O
  • Sub-system dates
  • Drawings
  • Vendors
  • Spares

Execution

Digital execution and quality control

Turn completions evidence and deficiencies into controlled, executable workflows.

ITR engine

One matrix serves tags, cables and pipes. Word, fillable PDF and native E-Forms operate side by side.

E-Forms & sign-off

Sectioned templates, conditional fields, record locking and configurable Executor / Reviewer / Approver workflows.

Field punchlisting

Real-time defect capture, photos, coordinates and Android / iOS support.

Weekly planning & rework

AI effort estimates, multi-trade allocation, constraint visibility and traceable RW-xxx rework packs.

Field to office

  • Immediate central updates
  • Digital evidence at the point of work
  • Controlled history of uploaded, rejected and completed records

Native mobile capture on Android and iOS.

Visibility

Visual control, readiness and AI

See completion status in registers, drawings, networks, schedules and executive views.

PCC register

Group tags across systems into functional control circuits. Compare forecast and actual starts, and drill into stage status.

P&ID overlay

Recolour pipes and instruments by test-record status on the latest issued revision. Hover for ITR, punchlist and test-pack detail.

Plant network

Graph tags, pipes, cables and PCCs. Filter by discipline, workpack or sub-system and jump directly to register rows.

Am-I-Ready

Focus attention on incomplete deliverables, blockers and readiness at WBS, PCC and workpack levels.

Reporting

Dashboards, gauges, Gantt views, Skyline timelines, activity logs and configurable Excel exports.

AI across CDS

Classify equipment, propose WBS structures, estimate effort, identify matrix gaps and draft weekly executive summaries from the audit trail.

Decision advantage

CDS connects status to the physical and functional context of the plant, reducing the need to reconcile disconnected spreadsheets, drawings and registers.

Governance

Governance, vendors and handover

Maintain auditable control while building the final turnover package continuously.

Certificate lifecycle

  • CVC and NOE registers with multiple active certificates per tag
  • Re-certification badges and pending status indicators
  • Configurable stage gates before downstream work opens

Vendor & compliance

  • Contracts, contacts, insurances, inductions and on-site schedules
  • Per-project roles, delegation and Terms Acceptance
  • Legal document visibility and complete activity logging

Handover & closeout

  • Bundle ITRs, certificates and workpack documents by workpack
  • Skip and failure reporting prevents silent gaps
  • Portable Excel registers and staged delivery for large dossiers
  • Structured exports shaped for asset register and CMMS load
  • Complete
  • Verify
  • Certify
  • Package
  • Handover

Handover is generated from controlled project records — not recreated as an end-of-project export exercise.

Value

Why CompletionsDS

A practical platform designed around the realities of major-project completions.

01

Prioritised work

Am-I-Ready reporting directs effort toward incomplete and constrained deliverables.

02

Lower administration

Automatic record allocation, imports, barcodes and digital workflows reduce manual handling.

03

Visible progress

Graphical dashboards, Gantt views and plant-context reporting show status clearly.

04

Estimated effort

Nominal record hours and crew-aware planning provide an early view of labour demand.

05

Portable closeout

Dossiers and register exports support project completion without mandatory ongoing storage.

06

Expert support

Direct access to personnel with software-development and major-project completions experience.

Connected data. Controlled evidence. Clear readiness.

CDS provides a continuous information pathway from project setup and field execution through certification, handover and operations.

Why Software First

Completions specialists who build software

CompletionsDS is developed by Software First. It wasn't designed in the abstract — it comes from people who have run completions on major resources and infrastructure projects, and who are still directly reachable when you're on the tools.

  • Early engagement. Data validation happens before setup, which saves substantial database re-work later.
  • Configured to your project. Template Projects clone a company-specific golden setup, so your standards travel between jobs.
  • Built from major-project delivery. Designed against the completions processes actually run on Australian resources and infrastructure projects.
  • Direct expert support. Access to personnel with both software-development and major-project completions experience.

Get the completions structure right before you start construction.

Early engagement and data validation save substantial database re-work later.

Talk to a completions specialist

FAQ

Common questions

What does CompletionsDS manage?

Asset data, inspection and test records, punchlists, workpacks, certification, reporting and handover evidence — connected in one project environment. Tags, cables, pipes, I/O and drawings stay linked to the ITRs, certificates and workpacks that belong to them.

What data do you need from us to set up?

As a minimum: mechanical, electrical and instrument registers, cables, PLC I/O, sub-system dates, drawings, vendors and spares. Setup runs in four phases — project shell, prerequisites, register import, then form template selection.

How long does mobilisation take?

Early engagement and data validation are completed before CDS setup, which saves substantial database re-work. Import mapping, error recovery and Template Projects — which clone a company-specific golden setup — all accelerate mobilisation. Get it right before importing.

Does it work in the field?

Yes. Field punchlisting captures defects, photos and coordinates in real time with Android and iOS support, and updates land centrally straight away. Uploaded, rejected and completed records all keep a controlled history.

Where does AI actually fit in?

In specific, checkable places: an Equipment Classifier proposes disciplines and project stages, a WBS Planner develops a defensible hierarchy from imported data, effort estimates feed weekly planning, matrix gaps are identified, and weekly executive summaries are drafted from the audit trail.

What do we get at handover?

ITRs, certificates and workpack documents bundled by workpack, with skip and failure reporting so silent gaps can't pass. Large dossiers support staged delivery, and portable Excel registers mean closeout doesn't depend on ongoing storage with us. Handover is generated from controlled project records, not recreated as an end-of-project export exercise.

Does it hand off to our CMMS or asset register?

Yes — through structured register exports built to be loaded into an asset register or CMMS rather than re-keyed. Tag, sub-system and workpack keys are carried through, so completion status, certificates and any outstanding punchlist items land against the right asset. Export layout is configurable and agreed during setup so it matches your target system's load format.

Can we keep our own certification and sign-off rules?

Yes. Executor / Reviewer / Approver workflows are configurable, certificates support CVC and NOE registers with multiple active certificates per tag, and configurable stage gates control when downstream work opens.

Where is our data hosted, and who can reach it?

CompletionsDS is hosted and operated by Software First on Microsoft Azure in an Australian region, with per-project access, role-based permissions and full activity logging. Hosting, access control, backup, application security and what happens to your data at the end of the project are all covered on the security and hosting page — and a completed vendor questionnaire is available on request.

Contact

Talk to us about your project

Tell us what you're delivering and where you are in the schedule. We'll show you how CDS would be set up for it — and be straight with you if it isn't the right fit.

Downloads

Get the PDFs

Tell us who you are and they're yours. You'll hear from us only if there's something worth talking about.

Which would you like?